Sy
Syaala
Modeling
?
General Partner
Optimiser
Which terms to ask each counterparty for: the best package, the negotiation menu and the target bands
Deal or site
baseline structure
Basis (lever=value, one per line or separated by semicolons)
What may move
Counterparties to negotiate with
Structures considered
Hold at the baseline (lever ids, comma separated)
Objective, constraints, budget
Objective
LP IRR P50 floor
LP IRR P10 floor
DSCR P10 floor
Customer cost cap
share above the baseline
LP equity cap
Budget, minutes
Search draws
Robust draws
Baseline, best package and the alternatives (robust draws)
Every figure from the deal engine
| Package | Feasible | Objective | Syaala Infra | C-Corp | LP IRR P50 | LP IRR P10 | LP equity | Customer cost | Site owner | DSCR P10 |
|---|
Best package: the terms that change
| Term | Counterparty | Baseline | Recommended |
|---|
Pareto front: objective against LP IRR P10
Negotiation menu by counterparty
Alone: the term switched from the baseline on its own. Conceded: what the best package loses without it
| Term | Baseline | Recommended | Alone: objective | Alone: LP IRR P10 | Alone: customer cost | Conceded: objective lost | Needed for feasibility |
|---|
Target bands: opening, target, walk-away
| Lever | Counterparty | Opening | Target | Walk-away | Opening bound by | Walk-away bound by |
|---|